1885/95 Angelo Vescovali (1826/95) head of the municipal
hydraulic office who, besides this, designed four other bridges in the center
of Rome (Garibaldi, Cavour, Regina Margherita and Palatino)
It is
105.65 m (346 feet) long
The
work lasted ten years as a result of the works for the construction of the
embankments of the Tiber River that left no space for the bridge's construction
site
No comments:
Post a Comment